• Phone
  • Whatsapp
  • Message
× Send

DB Manual Tong | SGPE | Q 3.1/2~17-90

Description

Q 3.1/2~17-90 DB Manual Tong

API 7K Oilfield Manual Tong for Drilling, Workover and Well Service

The Q 3.1/2~17-90 DB Manual Tong from SGPE is a heavy-duty oilfield manual tong for drilling rigs, workover rigs, well service units and rig floor tubular connection work. Rig crews use it to handle drill pipe, tubing, casing, couplings, subs and downhole tools during make-up, break-out and other threaded pipe connection operations.

This DB type manual tong covers pipe sizes from 3-1/2 inch to 17 inch, or 88.9 mm to 432 mm. Operators can match different tubular outside diameters by changing the latch lug jaw, hinge pin hole and latch step. This flexible setup allows one tong body to serve several pipe programs, helping crews reduce tool changes and improve rig floor efficiency.

SGPE designs and manufactures the Q 3.1/2~17-90 DB Manual Tong according to API Spec 7K requirements. The tong combines a strong mechanical structure, practical jaw system and simple field operation. It gives drilling contractors, workover service companies, well service teams and petroleum equipment distributors a reliable tool for daily oilfield pipe handling.

For faster selection, send SGPE your pipe OD, pipe type, required torque and rig application. Our team can recommend a suitable DB Manual Tong configuration for drilling, workover, casing service or well service projects.


Oilfield Manual Tong for Rig Floor Tubular Connection Work

Manual tongs play an important role in oilfield pipe handling. On the rig floor, crews need a dependable mechanical tool to connect and disconnect threaded tubulars safely and efficiently. The SGPE Q 3.1/2~17-90 DB Manual Tong grips the pipe, applies torque and supports stable connection work in demanding field conditions.

This manual tong suits many common oilfield tasks, including drill pipe connection, tubing make-up, tubing break-out, casing service, coupling tightening, sub handling and downhole tool service. Its wide working range allows crews to handle different pipe sizes without replacing the complete tong body.

Oilfield jobs often involve several tubular sizes in one project. For this reason, the DB Manual Tong uses interchangeable latch lug jaws and adjustable hinge pin holes. This design helps operators fit the tong to the pipe outside diameter, improve jaw contact and shorten preparation time when pipe sizes change.


Key Features of SGPE Q 3.1/2~17-90 DB Manual Tong

Wide Size Range from 3-1/2 Inch to 17 Inch

The SGPE DB Manual Tong handles oilfield tubulars from 3-1/2 inch to 17 inch. This range makes it suitable for drill pipe, tubing, casing and other threaded petroleum tools used on drilling rigs, workover rigs and well service units.

Rated Torque up to 90 kN·m

The tong provides rated torque up to 90 kN·m for pipe sizes from 3-1/2 inch to 11-1/4 inch. For larger pipe sizes from 11-3/4 inch to 17 inch, the rated torque reaches 55 kN·m. These torque ratings support many pipe make-up, break-out and tubular connection tasks in oilfield environments.

Interchangeable Latch Lug Jaws

Operators can change latch lug jaws according to the required pipe size. This feature gives the tong strong flexibility and allows one tong body to handle different tubulars during drilling, workover, casing and well service operations.

Adjustable Hinge Pin Holes and Latch Steps

Different hinge pin hole positions and latch steps help the tong fit different outside diameters. With the correct setup, the jaw contacts the pipe more effectively and supports smoother torque application during threaded connection work.

API Spec 7K Manufacturing

SGPE manufactures this manual tong according to API Spec 7K requirements. This makes the Q 3.1/2~17-90 DB Manual Tong a suitable choice for professional oilfield drilling and well servicing applications where reliability matters.

Mechanical Structure for Field Use

The tong body, jaw system, hinge pin and latch components support frequent use on drilling and workover rig floors. Since the tool uses a mechanical design, crews can complete pipe connection work without a hydraulic power unit.


Petroleum Industry Applications

The Q 3.1/2~17-90 DB Manual Tong serves a wide range of petroleum field applications. On drilling rigs, crews use this DB Manual Tong for drill pipe handling, tool joint connection, sub handling and threaded pipe make-up and break-out work. Its wide size range helps operators manage different tubular sizes during daily rig floor operations.

In workover operations, the tong supports tubing running, tubing pulling, tubing connection work, casing service and production well maintenance. Workover crews can adjust the latch lug jaw, hinge pin hole and latch step according to the pipe outside diameter. This adjustment improves gripping stability and reduces preparation time when crews move between pipe sizes.

For well service units, this manual tong helps crews handle tubing, casing, couplings, subs, tool joints and downhole tools during well repair and field maintenance work. It also supports casing connection, casing break-out and casing coupling tightening when crews select the correct jaw configuration.

The DB Manual Tong gives oilfield crews a practical mechanical tool for pipe string assembly, pipe string disassembly and rig floor tubular maintenance. It improves tool flexibility, supports secure pipe grip and helps crews complete connection work more efficiently in demanding field conditions.


Technical Specifications of Q 3.1/2~17-90 DB Manual Tong

No. of Latch Lug Jaw No. of Hinge Pin Hole Size Range inch Size Range mm Rated Torque kN·m
1# I 3-1/2 ~ 6 88.9 ~ 152 90
1# II 5-3/4 ~ 7 146 ~ 178 90
1# III 6-5/8 ~ 8-1/4 168 ~ 210 90
2# I 8 ~ 9-5/8 203 ~ 244 90
2# II 10-5/8 ~ 11-1/4 270 ~ 286 90
3# I 11-3/4 ~ 12-3/4 298 ~ 324 55
3# II 13-3/8 ~ 14-3/8 340 ~ 365 55
4# II 16 ~ 17 406 ~ 432 55

Manual Tong for Drilling Rig Operations

Drilling crews often connect and disconnect drill pipe, tool joints, subs and other threaded tools. The Q 3.1/2~17-90 DB Manual Tong gives crews a strong mechanical tong for these rig floor tasks.

Its 90 kN·m rated torque supports many common drilling tubular sizes. Meanwhile, the adjustable jaw and hinge pin design helps operators fit different outside diameters during drilling programs. When the pipe size changes, crews can adjust the tong configuration instead of preparing another complete tool.

This flexibility helps drilling contractors improve equipment utilization, shorten preparation time and keep pipe handling work moving smoothly on the rig floor.


Manual Tong for Oilfield Workover Operations

Workover jobs often involve tubing pulling, tubing running, casing service, production well maintenance and downhole tool handling. These operations need durable tools that adapt quickly to changing pipe sizes and field conditions.

The SGPE DB Manual Tong supports tubing make-up, tubing break-out, casing connection work and service tool handling. Its mechanical structure makes inspection, adjustment and maintenance easier in field locations where crews need reliable equipment with simple operation.

For workover rigs, this tong offers a practical balance of broad size coverage, secure gripping and easy handling.


Manual Tong for Well Service Units

Well service units need durable and easy-to-use tools for routine field work. The Q 3.1/2~17-90 DB Manual Tong helps service crews handle tubing, casing, couplings and downhole tools during well maintenance and repair operations.

Because the tong does not require a hydraulic power unit, crews can use it as a dependable mechanical tool for daily well service tasks. Its interchangeable jaw system also helps service teams respond to different pipe sizes across different wells.


Drill Pipe, Tubing and Casing Size Coverage

The Q 3.1/2~17-90 DB Manual Tong covers a wide range of oilfield tubulars. It can support drill pipe connection work during drilling, tubing operations during workover and well service, and casing handling during casing service or maintenance work.

For small and medium pipe sizes, the tong offers up to 90 kN·m rated torque. For larger casing sizes, it provides 55 kN·m rated torque. This makes the tool suitable for many pipe handling jobs that require mechanical grip and controlled torque application.


Product Structure and Working Principle

The DB Manual Tong uses a tong body, latch lug jaw, hinge pin, latch step and handle structure to grip oilfield tubulars and transfer torque. Before operation, the crew selects the correct latch lug jaw and hinge pin hole according to the pipe outside diameter.

During make-up operations, the tong grips the pipe and helps tighten the threaded connection. During break-out operations, it helps loosen the connection so the crew can separate the pipe string, casing joint, tubing section or downhole tool.

This simple working principle gives operators direct control on the rig floor. It also makes inspection and maintenance easier in field environments where mud, oil, vibration and frequent pipe movement are common.


Advantages for Oilfield Contractors

The SGPE Q 3.1/2~17-90 DB Manual Tong helps drilling and workover crews improve daily rig floor efficiency. One tong body can cover tubulars from 3-1/2 inch to 17 inch through different jaw and hinge pin configurations, so contractors can reduce tool inventory and improve field flexibility.

With the correct jaw configuration, the tong grips the pipe firmly and helps reduce slipping during make-up and break-out work. This stable grip supports smoother torque application and helps crews handle threaded connections more confidently.

The manual structure also simplifies inspection and maintenance. Rig crews can check the tong body, jaws, pins and latch components during routine checks, which helps reduce downtime and keeps the tool ready for field service.

In addition, the API Spec 7K design gives buyers more confidence when sourcing manual tongs for professional drilling, workover and well service projects.


Available Support from SGPE

SGPE supports customers with model selection, technical communication and size configuration guidance. For the Q 3.1/2~17-90 DB Manual Tong, customers can provide pipe size, pipe type, torque requirement and rig information. Based on these details, SGPE can recommend suitable latch lug jaws, hinge pin positions and related spare parts.

For international customers, SGPE can help confirm product details, technical parameters, packing information, export requirements and replacement parts needs before order confirmation. This support helps distributors, drilling contractors and workover service companies reduce selection risks and purchase a manual tong that fits actual rig floor conditions.

SGPE can also provide product information for procurement teams and discuss export packing, delivery details and spare parts communication. This helps customers complete the purchasing process more smoothly and confidently.


Quality Control and Manufacturing Focus

SGPE focuses on durable oilfield equipment for drilling, workover and well service operations. For the Q 3.1/2~17-90 DB Manual Tong, SGPE pays attention to material selection, machining quality, assembly accuracy and field reliability.

Before delivery, SGPE checks key components and confirms that the product meets the required technical parameters. The company also helps customers review configuration needs before order confirmation, which supports better fit for actual field use.

For international buyers, clear technical communication matters. SGPE provides product information and selection support to help customers choose suitable manual tongs for new rig equipment, replacement tools or spare parts supply.


How to Select the Correct DB Manual Tong Configuration

When choosing the Q 3.1/2~17-90 DB Manual Tong, buyers should confirm three key points: pipe size range, torque requirement and field operation type.

For drill pipe handling, customers should match the tool joint or pipe outside diameter with the correct latch lug jaw and hinge pin hole. For tubing workover operations, buyers should confirm tubing sizes and expected connection requirements. For casing service, customers should check casing outside diameter and required rated torque.

A correct configuration helps the tong grip the pipe more effectively and improves working efficiency after delivery. SGPE can assist with size matching and configuration recommendations according to actual field conditions.


Maintenance Tips for Oilfield Use

Regular maintenance helps extend the service life of the DB Manual Tong. Crews should inspect the tong before and after rig floor operations. Key inspection points include the jaw surface, latch lug jaw, hinge pin, latch step, tong body and connection parts.

After use, crews should remove mud, oil and debris from the tong. Clean parts allow easier inspection and better operation. Operators should also lubricate moving parts according to the maintenance plan.

If crews find heavy wear, cracks or deformation, they should replace the damaged parts before the next operation. Good maintenance helps the manual tong perform reliably in drilling, workover and well service environments.


Why Choose SGPE Q 3.1/2~17-90 DB Manual Tong?

SGPE supplies oilfield manual tongs and petroleum handling tools for drilling contractors, workover service companies, well service teams and oilfield equipment distributors. The Q 3.1/2~17-90 DB Manual Tong offers wide pipe size coverage, API Spec 7K design and dependable field performance for drilling, workover and well service operations.

Customers choose SGPE because the company provides API Spec 7K oilfield manual tongs with practical configurations for different rig floor applications. This DB Manual Tong covers pipe sizes from 3-1/2 inch to 17 inch and delivers rated torque up to 90 kN·m, which helps crews handle drill pipe, tubing, casing, couplings, subs and other threaded petroleum tools during connection work.

SGPE also supports customers with interchangeable latch lug jaw options and configuration guidance for different tubular sizes. By confirming pipe outside diameter, torque requirement and field application, SGPE can help buyers choose a suitable DB Manual Tong setup for drilling rigs, workover rigs or well service units.

In addition, SGPE provides technical communication, spare parts support and export service for international oilfield equipment buyers. With SGPE support, customers can select a DB Manual Tong that fits their drilling, workover or well service project more accurately and confidently.


Frequently Asked Questions About DB Manual Tong

1. What is the Q 3.1/2~17-90 DB Manual Tong used for?

Rig crews use the Q 3.1/2~17-90 DB Manual Tong for pipe make-up, break-out and threaded connection work during drilling, workover and well service jobs. It grips drill pipe, tubing, casing, couplings, subs and downhole tools, then helps crews apply torque on the rig floor.

This DB type manual tong works well when crews need a simple mechanical tool for threaded tubular connections. It gives operators direct control during pipe handling and supports daily rig floor work without a hydraulic power unit.

2. What pipe size range does the Q 3.1/2~17-90 DB Manual Tong cover?

The Q 3.1/2~17-90 DB Manual Tong covers pipe sizes from 3-1/2 inch to 17 inch, or 88.9 mm to 432 mm. This wide range allows the tong to handle several tubular sizes with one tong body.

Operators can change the latch lug jaw, hinge pin hole and latch step to match different pipe outside diameters. This flexible setup makes the tong suitable for drill pipe, tubing, casing and other threaded petroleum tools.

3. What is the rated torque of this DB Manual Tong?

This DB Manual Tong provides rated torque up to 90 kN·m for pipe sizes from 3-1/2 inch to 11-1/4 inch. For larger pipe sizes from 11-3/4 inch to 17 inch, it provides 55 kN·m rated torque.

These torque ratings support many common make-up and break-out operations. Before ordering, customers should confirm the pipe size, connection type and required torque so SGPE can recommend the right configuration.

4. Does SGPE manufacture the Q 3.1/2~17-90 DB Manual Tong according to API Spec 7K?

Yes. SGPE designs and manufactures the Q 3.1/2~17-90 DB Manual Tong according to API Spec 7K requirements for drilling and well servicing equipment.

API 7K design helps buyers choose a manual tong for professional field use. It also gives drilling contractors, workover service companies and equipment distributors more confidence when sourcing rig floor handling tools.

5. Can this manual tong work on drilling rigs?

Yes. The Q 3.1/2~17-90 DB Manual Tong works on drilling rigs where crews handle drill pipe, tool joints, subs and related threaded tools. It helps crews connect and disconnect tubulars during drilling operations.

Its wide size range and adjustable jaw system allow operators to match different pipe diameters during drilling programs. This helps reduce tool changes and keeps rig floor pipe handling work more efficient.

6. Can this DB Manual Tong support workover operations?

Yes. Workover crews can use this DB Manual Tong for tubing running, tubing pulling, tubing make-up, tubing break-out, casing service and downhole tool handling. It offers a practical solution for production well maintenance and workover rig operations.

Because workover jobs often involve different pipe sizes, the interchangeable latch lug jaw design gives crews useful flexibility. They can adjust the tong according to the required tubing, casing or service tool size.

7. Can the Q 3.1/2~17-90 DB Manual Tong handle drill pipe, tubing and casing?

Yes. This manual tong can handle drill pipe, tubing and casing when operators choose the correct latch lug jaw, hinge pin hole and latch step. It also supports couplings, subs, tool joints and many threaded oilfield tools.

For smaller and medium pipe sizes, the tong provides up to 90 kN·m rated torque. For larger casing sizes, it provides 55 kN·m rated torque. This makes it useful for many pipe connection tasks on drilling rigs, workover rigs and well service units.

8. How do operators adjust the DB Manual Tong for different pipe sizes?

Operators adjust the DB Manual Tong by selecting the correct latch lug jaw, hinge pin hole and latch step for the pipe outside diameter. This setup helps the jaw contact the pipe surface more effectively.

A correct configuration improves grip, reduces slipping and supports smoother torque application during make-up and break-out work. If customers provide the pipe size and operation type, SGPE can help match the suitable jaw and hinge pin position.

9. What information should customers provide before ordering this manual tong?

Customers should provide the pipe size range, pipe type, torque requirement and field application. For example, they can share whether the tong will work on a drilling rig, workover rig, well service unit or casing service job.

Clear information helps SGPE recommend the right DB Manual Tong configuration. It also helps confirm suitable latch lug jaws, hinge pin holes, spare parts and delivery requirements before production or shipment.

10. What are the main advantages of the SGPE Q 3.1/2~17-90 DB Manual Tong?

The main advantages include wide pipe size coverage, strong mechanical structure, API Spec 7K design, interchangeable latch lug jaws and easy field operation. One tong body can cover pipe sizes from 3-1/2 inch to 17 inch, which helps contractors reduce tool inventory.

The manual structure also makes inspection and maintenance easier. Rig crews can check the jaw surface, hinge pin, latch step and tong body during routine field maintenance, which helps keep the tool ready for service.

11. How should crews maintain the DB Manual Tong in oilfield environments?

Crews should inspect the DB Manual Tong before and after rig floor operations. Key inspection points include the jaw teeth, latch lug jaw, hinge pin, latch step, tong body and connection parts.

After use, crews should remove mud, oil, sand and debris from the tong. They should also lubricate moving parts according to the maintenance plan. If they find heavy wear, cracks or deformation, they should replace the damaged parts before the next operation.

12. Can SGPE provide configuration support and spare parts for DB Manual Tong?

Yes. SGPE can help customers choose the correct manual tong model, latch lug jaw, hinge pin hole and size configuration according to pipe diameter, torque requirement and field application.

SGPE can also support spare parts communication for latch lug jaws, hinge pins and related wearing parts. For faster support, customers can send the tong model, pipe size range, required application and project details when requesting a quote.


Request a Quote from SGPE

The Q 3.1/2~17-90 DB Manual Tong gives oilfield crews a reliable mechanical tool for drilling, workover, well service and rig floor tubular handling. With a wide size range, API 7K design, interchangeable jaw system and rated torque up to 90 kN·m, this DB type manual tong supports demanding pipe make-up and break-out operations.

Contact SGPE to get technical details, price information, delivery time and suitable jaw configuration for your drilling, workover, casing service or well service project. For faster quotation, please send your pipe OD, pipe type, required torque, jaw configuration needs and project delivery schedule.

E-Mail:
info@sgpe.com

Get a Quote Now!

Subscribe To Our Newsletter

Get exclusive purchase tips,  petroleum equipment solutions that we don’t share anywhere else.

contact us